Skip to content

EQX

Current
Price
CA$12.02
Discount category
Close to intrinsic value
Intrinsic value source
AI estimate
Next earnings
Feb 9, 2027
Next earnings is estimate
Yes
Company name
Equinox Gold
Sector
Gold mining
About
Equinox Gold Corp. (EQX) is based in Vancouver, Canada. It produces gold at Greenstone and Musselwhite in Ontario, Valentine in Newfoundland and Labrador, its Nicaragua operations, Camino Rojo in Mexico and Mesquite in California. It got Musselwhite, Camino Rojo and the South Railroad project in Nevada in its combination with Orla Mining on July 31, 2026, and it sold its Brazil operations on January 23, 2026. It is building the Valentine Phase 2 expansion and South Railroad, and it also owns Los Filos in Mexico and Castle Mountain in California. The common shares trade on the Toronto Stock Exchange in Canadian dollars and on the NYSE American. Equinox Gold reports in US dollars and files 40-F and 6-K reports with the SEC.
Thesis
The market pays close to the AI estimate for Equinox Gold because a high gold price and new Canadian production are balanced by high costs and the risks of a new combination. AISC was $2,091 per ounce in Q3 2026, and the company expects 2026 production near the low end of 870,000 to 920,000 ounces and AISC near the high end of $1,900 to $2,000 per ounce. Jason Simpson, the former Chief Executive Officer of Orla, became Chief Executive Officer on November 1, 2026. For the value to rise, three things must be true. Greenstone and Valentine must run near their design rates, so that production is more than one million ounces a year at lower AISC. The company must complete Valentine Phase 2 for its $436 million budget in late 2028 and start production at South Railroad in the first half of 2028. The gold price must stay well above these costs. The Q4 2026 report with 2027 guidance, expected in early February 2027, is the next test. If the gold price falls or costs stay high, the value can fall.
Valuation
The intrinsic value for Equinox Gold is an AI estimate from November 14, 2026. It is not an analyst's value. An AI research agent calculated it from the reports of Equinox Gold with the SEC (Forms 6-K and 40-F). The company reports in US dollars, and the value is in Canadian dollars, the currency of the Toronto Stock Exchange listing. The estimate converts at 1.4257 Canadian dollars per US dollar, the Bank of Canada daily rate for November 13, 2026, which is an assumption. The method is a multiple of the 2027 margin above all-in sustaining costs (AISC), less corporate costs, after tax, plus net cash and the exercise money of the warrants, less the gold prepay obligations and the payments still due for Greenstone and Musselwhite, divided by the fully diluted shares. 2027 is the first full year with Musselwhite and Camino Rojo, which Equinox Gold got in its combination with Orla Mining on July 31, 2026. The Q3 2026 release (6-K, November 9, 2026) gives Q3 production of 237,019 ounces at an average realized price of $4,157 per ounce and AISC of $2,091 per ounce, full-quarter production of 63,090 ounces at Musselwhite and 26,168 ounces at Camino Rojo, and 2026 guidance of 870,000 to 920,000 ounces, near the low end, at AISC of $1,900 to $2,000 per ounce, near the high end. The Q3 2026 MD&A guides 2026 general and administrative costs of $95 million to $105 million, and it gives income before tax of $800.1 million and tax of $325.7 million from continuing operations for nine months, a tax rate of about 41%. The Q3 2026 financial statements give cash of $527.9 million, a credit facility of $325.6 million and other loans of $14.2 million at September 30, 2026, so net cash before the convertible notes is $188.2 million. They give gold prepay obligations of $273.6 million, contingent consideration of $93.3 million for Greenstone and $19.0 million for Musselwhite, and 33,399,799 warrants at an average exercise price of C$9.45, or about $221.4 million. The 2023 convertible notes became 28,475,117 shares after September 30, 2026. The MD&A gives 1,195,591,053 shares and 1,246,711,088 fully diluted shares, with options, share units, warrants and the 2025 convertible notes, at its date. The estimate counts the 2025 convertible notes as shares, not as debt, and it leaves out the payment of up to $115 million that depends on gold sales of the Brazil operations it sold. The gold price, production, AISC, corporate costs of $100 million a year, a tax rate of 35% and the multiples are assumptions. The low case assumes 950,000 ounces at a gold price of $3,300 and AISC of $2,000 per ounce, at 6 times. It gives US$3.57, or C$5.09 per share. The base case assumes 1,050,000 ounces at $4,000 and $1,900, at 8 times. It gives US$8.80, or C$12.54 per share. The high case assumes 1,120,000 ounces at $4,600 and $1,800, with Greenstone and Valentine at design rates, at 10 times. It gives US$15.85, or C$22.59 per share. The multiples include growth after 2027 from the Valentine Phase 2 expansion and South Railroad. The estimate assumes weights of 25%, 50% and 25%. The weighted intrinsic value is C$13.19 per share. The value moves strongly with the gold price. Greenstone and Musselwhite are long-life mines in Canada, but Equinox Gold sells a commodity at a price it does not set, several of its mines have high costs, and its reserves deplete, so the estimate finds no durable advantage of ten years or more. As of Nov 14, 2026.
Risks
The value moves strongly with the gold price, which the company does not set. A fall in the gold price lowers margins and cash flow, first at the high-cost mines. Costs are high. AISC was $2,091 per ounce in Q3 2026, and Greenstone, the Nicaragua operations and Mesquite each had AISC above $2,400 per ounce. Greenstone and Valentine are still ramping up. If they do not reach their design rates, production stays lower and costs stay higher. Under the Orla gold prepay arrangement, the company must deliver about 4,025 ounces of gold a month through February 2028 with no more cash in return, and it owes contingent payments for Greenstone and Musselwhite. Operations in Nicaragua and Mexico add political, permit and tax risk, and South Railroad still needs some state permits and water rights. Valentine Phase 2, with a budget of $436 million, and South Railroad, with initial capital of $395 million, need most of their capital in 2027 and 2028.
Balance sheet
Cash: $528M Debt: $512M Net cash: $16M Undrawn credit line: $635M, to July 2030 Debt due within 12 months: $178M At September 30, 2026, Equinox Gold had unrestricted cash and cash equivalents of $527.9 million. Loans and borrowings were $512.0 million: $325.6 million under the revolving credit facility, $148.1 million of 2023 convertible notes, $24.1 million of 2025 convertible notes and $14.2 million of other loans. After September 30, 2026, the 2023 convertible notes became shares, and net cash without them was $164.0 million. $634.6 million of the $1.0 billion revolving credit facility was undrawn, and the facility runs to July 31, 2030. The company also had deferred revenue of $459.4 million, which it pays with deliveries of gold under a stream, gold prepay transactions and a gold sale arrangement, and contingent consideration of $93.3 million for Greenstone. As of Sep 30, 2026.
Checkpoints
Feb 9, 2027 (estimate): Q4 2026 results and 2027 guidance. Pending. Watch: 2026 production is in the range of 870,000 to 920,000 ounces and 2027 guidance shows more than one million ounces at lower AISC, and this passes; lower production or higher AISC guidance fails. Q2 2028 (estimate): First gold at South Railroad. Pending. Watch: South Railroad pours first gold in the first half of 2028 within its $395 million initial capital, and this passes; a delay or a large cost overrun fails.
Recent events
Nov 9, 2026: Equinox Gold reported Q3 2026 results. It produced 237,019 ounces of gold, sold gold at an average realized price of $4,157 per ounce, and had AISC of $2,091 per ounce. Revenue was a record $1.0 billion, adjusted EBITDA was $533.0 million and net income was $62.5 million. It declared a quarterly dividend of $0.0225 per share. Nov 1, 2026: Jason Simpson, the former Chief Executive Officer of Orla Mining, became Chief Executive Officer after Darren Hall retired on October 31, 2026. Sep 21, 2026: Equinox Gold called its $172.5 million of 4.75% convertible notes due 2028 for redemption. The holders converted all of them into 28,475,117 common shares. Aug 14, 2026: The US Bureau of Land Management issued the Record of Decision for South Railroad in Nevada, and Equinox Gold started early construction works, with first gold targeted for the first half of 2028. Aug 5, 2026: The Board approved construction of the Valentine Phase 2 expansion with an initial capital budget of $436 million, to double processing to 5.0 million tonnes per year by late 2028, and raised the dividend by 50% to $0.09 per share a year. Jul 31, 2026: Equinox Gold completed its combination with Orla Mining. It issued 378.1 million shares, valued at $3.6 billion, and got Musselwhite, Camino Rojo and South Railroad. Jun 25, 2026: Equinox Gold signed 20-year land access agreements with the three communities of Los Filos in Mexico, which allow a gradual restart of heap leach operations. Apr 27, 2026: Equinox Gold increased its revolving credit facility from $850 million to $1.0 billion and extended its maturity to July 31, 2030. Jan 23, 2026: Equinox Gold sold its Brazil operations for $891.1 million in cash, plus up to $115 million that depends on later gold sales. It used the money to repay its $500 million term loan and its secured credit facility with Sprott.
See changes