- Tourmaline Oil Corp. (Tourmaline) is based in Calgary, Alberta. It says that it is Canada's largest natural gas producer. It explores for, develops and produces natural gas, crude oil, condensate and NGL, mainly in the Alberta Deep Basin and the Montney in northeast British Columbia (NEBC). Production averaged 593,730 boe per day in Q3 2026, of which natural gas was 2,886 million cubic feet per day. It sells part of its natural gas at international LNG prices (JKM and TTF) and in US markets. It owns 8.4 million shares of Topaz Energy, a royalty and infrastructure company. The common shares trade on the TSX in Canadian dollars. Tourmaline is not an SEC filer, and it publishes its quarterly reports with its MD&A and financial statements on its investor site.
- Thesis
- The price of Tourmaline depends on Canadian natural gas prices, which were very low in 2026. In Q3 2026 the AECO 5A benchmark price averaged CAD $1.59 per mcf. Tourmaline realized CAD $3.41 per mcf because of its sales in other markets and its hedges, but production fell 6% to 593,730 boe per day because Tourmaline kept volumes back for higher prices later. Tourmaline says that local prices are at a cyclical low and expects them to rise as export capacity and Alberta gas demand grow. For the price to hold or rise, three things must be true. Production must rise to 635,000 to 645,000 boe per day in Q4 2026 and grow 4% to 6% in 2027, as Tourmaline expects. Gas prices must support the expected free cash flow of $1.8 billion in 2027, which Tourmaline calculated at strip prices of October 15, 2026. The NEBC infrastructure projects, such as the Groundbirch-Monias deep cut plant in Q4 2027, must start on time. The Q4 2026 report, expected in early March 2027, and the 2027 quarters are the next tests.
- Risks
- Cash flow depends on natural gas and liquids prices. The AECO 5A benchmark price averaged CAD $1.59 per mcf in Q3 2026. Hedges cover an average of 502 mmcf per day of natural gas in 2027 at an average fixed price of CAD $6.28 per mcf, which is a part of its production.
Third-party facilities and pipelines limit volumes. An unplanned outage at a third-party gas processing facility in NEBC in October 2026 is expected to reduce Q4 volumes by about 3,000 boe per day.
Large projects can be late or cost more. The NEBC infrastructure buildout has two phases, and the Groundbirch-Monias deep cut plant is planned to start in Q4 2027.
Decommissioning costs are large. Decommissioning obligations were $805.1 million at September 30, 2026.
Short-term debt must be rolled over. Tourmaline had $479.6 million of commercial paper and $250.0 million of notes due May 30, 2027 at September 30, 2026, and its undrawn revolving credit facility backs the commercial paper.
- Balance sheet
- Cash: CA$0.0M
Debt: CA$1.4B
Net debt: CA$1.4B
Undrawn credit line: CA$2.1B, to June 2031
Debt due within 12 months: CA$730M
Last debt due: 2031
All amounts are in Canadian dollars. At September 30, 2026, Tourmaline had $479.6 million of commercial paper with an average term of 29 days and $950.0 million of senior unsecured notes: $250.0 million due May 30, 2027, $250.0 million due January 25, 2028, $200.0 million due February 12, 2029 and $250.0 million due March 16, 2031. The $2.55 billion revolving credit facility was undrawn and matures in June 2031, and Tourmaline reserves capacity on it for the commercial paper. The $75.0 million operating credit facility was undrawn. Net debt, which includes the adjusted working capital deficit, was $1,539.7 million, below the long-term target of $1.75 billion. Decommissioning obligations were $805.1 million. On October 8, 2026, Tourmaline received gross proceeds of $330.6 million from the sale of Topaz shares. Cash flow was $2,436.5 million for nine months. Shareholders' equity was $16,421.7 million.
As of Sep 30, 2026.
- Checkpoints
- Mar 3, 2027 (estimate): Q4 2026 results. Pending. Watch: Production averages 635,000 to 645,000 boe per day in Q4 2026 and exit production reaches 670,000 boe per day or more, and this passes; lower production fails.
Dec 2027 (estimate): Groundbirch-Monias plant start-up. Pending. Watch: The Groundbirch-Monias deep cut plant starts in Q4 2027 as planned, and this passes; a delay into 2028 fails.
- Recent events
- Nov 4, 2026: Tourmaline reported Q3 2026 results. Net earnings were $641.5 million ($1.64 per diluted share) and cash flow was $788.3 million. It plans EP capital spending of $2.6 billion in 2027 and expects free cash flow of $1.8 billion at strip prices. The Aitken c-38-C deep cut gas processing expansion was completed on schedule.
Nov 4, 2026: Tourmaline formed Emerald Energy Technologies Corp., a subsidiary for power, compressed natural gas, water and carbon capture assets. Emerald plans to get private equity financing to buy some of these assets from Tourmaline.
Nov 4, 2026: Tourmaline amended its agreement with Centrica Energy to deliver 30,000 mmbtu per day more natural gas for seven years from April 2031, at prices linked to TTF.
Oct 8, 2026: Tourmaline sold 11.5 million common shares of Topaz Energy at $28.75 per share for gross proceeds of $330.6 million. It kept 8,431,097 Topaz shares and plans to use most of the proceeds to repurchase its own shares.
Sep 22, 2026: Tourmaline increased its quarterly base dividend by 5% from $0.50 to $0.525 per share, effective in Q4 2026.
Jun 1, 2026: Tourmaline bought Aduro Resources Ltd., with lands in northeast British Columbia, for total consideration of $53.0 million in cash and Topaz shares.