LUNCopper and gold mining
Lundin Mining
- Price
- CA$22.58
- Intrinsic value
- Intrinsic value from an AI estimate
- Discount category
- Below intrinsic value (AI estimate)
- Analysts
- Leaning bullish
- Next earnings
- Feb 4 · · estimated
- Pick status
- Research only
In short
- Thesis
- The market weighs the record copper prices and net cash of Lundin Mining against storm damage at Caserones and the cost of Vicuña, and a Vicuña sanction with a Caserones recovery can lift its value.
- Gap
- Can close. The Vicuña sanction decision, expected before the end of 2026, and the recovery of Caserones in 2027 are dated events that can close the gap within about two years.
Company guidance: 2026 copper 285,000-310,000 t; gold 134,000-149,000 oz; cash cost $1.95-2.15/lb; capital expenditures $980 million (, Q3 2026 MD&A)
Price history
About
Lundin Mining Corporation (Lundin Mining) is a Canadian mining company based in Vancouver. It has three operating mines: Candelaria (80%) and Caserones (75%) in Chile, which produce mainly copper, and Chapada in Brazil, which produces copper and gold. It owns 50% of Vicuña Corp., a joint venture with BHP that develops the Vicuña copper, gold and silver project on the border of Argentina and Chile, and 30.9% of the Los Helados project. Neves-Corvo, Zinkgruvan and Eagle are reported as discontinued operations, and the sale of Eagle closed on January 9, 2026.
Jack Lundin is President and Chief Executive Officer. Revenue was $1,109.2 million in Q3 2026. Lundin Mining reports in US dollars and does not file periodic reports with the SEC. Its shares trade on the Toronto Stock Exchange in Canadian dollars and on Nasdaq Stockholm.
Thesis
The price of Lundin Mining depends on copper prices and on the value of the Vicuña project, which is not yet in production. The realized copper price was a record $6.85 per pound in Q3 2026, and the company had net cash of $237.0 million at September 30, 2026. But severe winter storms stopped Caserones for about 30 days, and the company cut its 2026 copper guidance to 285,000 to 310,000 tonnes from 300,000 to 325,000 tonnes. Vicuña needs Stage 1 capital of $7.1 billion on a 100% basis, and Lundin Mining expects to borrow more under its credit facility when construction starts.
The AI estimate values the mines at a copper price below the 2026 level and counts only part of the published net present value of Vicuña. For the price to rise, four things must be true. Vicuña Corp. must sanction Stage 1 before the end of 2026 and keep its cost estimate. Caserones must recover the deferred tonnes in 2027.
The new ball mill at Chapada must start in late 2027 as planned. Copper prices must stay near $5.50 per pound or higher. The sanction decision and the Q4 2026 report, expected around February 4, 2027, are the next tests.
Valuation
AI estimate, checked by Kevin. How it is made
Show the method
The intrinsic value for Lundin Mining is an AI estimate from November 14, 2026. It is not an analyst's value. An AI research agent calculated it from the reports of Lundin Mining, which reports in US dollars and does not file periodic reports with the SEC. The values are in Canadian dollars per share, because the shares trade in Toronto.
The method is a multiple of the 2027 adjusted EBITDA of the operating mines at the share of Lundin Mining, plus a part of its 50% share of the published net present value of Vicuña, plus net cash, divided by the shares. The Q3 2026 MD&A (November 4, 2026) gives adjusted EBITDA of $1,932.4 million for the first nine months of 2026 and net cash of $237.0 million at September 30, 2026, and it says that net cash was about $200 million on November 4, 2026. It gives revised 2026 copper guidance of 285,000 to 310,000 tonnes. It gives 851,371,131 common shares at November 4, 2026, plus 856,737 time vesting share units, 879,671 performance share units and 3,607,766 options at a weighted average exercise price of C$20.27.
The estimate adds the units, and it adds the options by the treasury method at C$28.88, so it uses 854.18 million shares. The news release of June 16, 2026 (Capital Markets Day) forecasts 2026 adjusted EBITDA of $2.3 billion at $5.50 per pound copper and $4,000 per ounce gold. The estimate changes this by $705 million for each $1.00 per pound of copper price, which is about 320,000 tonnes of copper, and in proportion to production. It assumes that Lundin Mining owns 81% of the EBITDA, from its 80% of Candelaria, 75% of Caserones and 100% of Chapada.
The Vicuña technical study (news release of February 16, 2026) gives after-tax net present values at 8% on a 100% basis of $10.4 billion at $4.60 per pound copper and $3,500 per ounce gold, $17.0 billion at $5.50 and $4,000, and $19.5 billion at $6.00 and $4,000. The estimate counts 40%, 50% and 60% of the 50% share in the three cases, because the project is not yet sanctioned. The estimate assumes the Bank of Canada rate of November 13, 2026, which is 1.4257 Canadian dollars per US dollar. The copper prices, production, multiples and the parts of the Vicuña value are assumptions.
The low case assumes copper at $4.60 per pound, 300,000 tonnes, $50 million less EBITDA from a lower gold price and 6.5 times EBITDA. It gives C$16.98 per share. The base case assumes $5.50 per pound, 320,000 tonnes and 7 times. It gives C$29.03 per share.
The high case assumes $6.00 per pound, 330,000 tonnes and 7 times. It gives C$35.78 per share. The estimate assumes weights of 25%, 50% and 25%. The weighted intrinsic value is C$27.71 per share.
As of
Show 4 sourcesHide sources
- lundinmining.com /_resources/financials/2026-q3.pdf
- lundinmining.com /news/lundin-mining-capital-markets-day-highlights-strategic-vision-for-leading-growth-and-shareholder-returns-20260617/
- lundinmining.com /news/lundin-mining-announces-vicua-integrated-technical-study-results-highlighting-a-world-class-mining-district/
- bankofcanada.ca /valet/observations/FXUSDCAD/json?recent=5
Checkpoints
- Dec 2026PendingVicuña Stage 1 sanction decisionVicuña Corp. sanctions Stage 1 before the end of 2026 with capital close to $7.1 billion on a 100% basis, and this passes; a delay into 2027 or a much higher cost fails.
- Feb 4, 2027 · est.PendingQ4 2026 results and 2027 guidanceCaserones reaches its revised 2026 guidance of 105,000 to 115,000 tonnes of copper and the 2027 guidance shows a recovery, and this passes; another cut fails.
- Dec 2027PendingChapada ball mill startsThe new ball mill at Chapada starts in late 2027 as planned, and this passes; a delay into 2028 fails.
Recent events
- November 4, 2026Lundin Mining reported Q3 2026 results. Copper production was 62,610 tonnes at a cash cost of $2.01 per pound, and revenue was $1,109.2 million at a record realized copper price of $6.85 per pound. Net earnings attributable to shareholders were $228.9 million, and adjusted EBITDA was $647.7 million. The company cut Caserones copper guidance again, to 105,000 to 115,000 tonnes, because snowmelt still limits the ore to the mill. In the quarter, Vicuña signed a long-term royalty and infrastructure agreement with the Province of San Juan, and Lundin Mining bought back 2,448,400 shares for $62.4 million.
- August 18, 2026Lundin Mining said that a second severe winter storm hit its operations in Chile. It cut Caserones copper guidance to 120,000 to 130,000 tonnes from 130,000 to 140,000 tonnes and raised the Caserones cash cost guidance.
- June 16, 2026Before its Capital Markets Day, Lundin Mining set a goal of more than 500,000 tonnes of copper and 550,000 ounces of gold a year. It forecast adjusted EBITDA of about $13.2 billion in total for 2026 to 2030 at $5.50 per pound copper, and it sanctioned an additional ball mill at Chapada for the Saúva project. On the same day, Vicuña Corp. received approval for the RIGI investment regime in Argentina.
Show 3 older eventsHide older events
- April 7, 2026Lundin Mining completed its purchase from JX Advanced Metals of another 5% of Caserones, which raised its share to 75%, and of a 30.9% interest in the Los Helados project.
- February 26, 2026Lundin Mining increased its revolving credit facility to $4.5 billion and extended it to 2031. It has access to $2.25 billion now, and to the full amount after the sanction of Vicuña Stage 1.
- February 16, 2026Lundin Mining published the integrated technical study of Vicuña. On a 100% basis, it gives an after-tax net present value at 8% of $9.5 billion at $4.60 per pound copper and $3,300 per ounce gold, and Stage 1 capital of $7.1 billion.
Risks
- Copper prices drive most of the value. Revenue and cash flow fall fast if copper falls from the record level of 2026.
- Vicuña is a large project in the high Andes, on the border of Argentina and Chile. Stage 1 alone needs $7.1 billion on a 100% basis. Cost overruns, delays or changes in Argentine policy can lower its value, and the company may need funding beyond its credit facility.
- Caserones is at high altitude, and winter storms stopped it for about 30 days in Q3 2026. Weather can again cut production and raise costs.
- All operating mines are in Chile and Brazil. Changes to royalties, taxes, water rules or permits in these countries can lower profit.
- Partners own 20% of Candelaria and 25% of Caserones, so a part of the cash flow of these mines goes to them.
Key statistics
- Market cap
- CA$19B
- Shares of Nov 4, 2026
- Yield at current rate
- 0.5%
- Current annual rate, at the price of Nov 20, 2026
- Dividend yield
- 0.5%
- Last 12 months, at the price of Nov 20, 2026
- 52-week range
- CA$22.58 – CA$45.74
- To Nov 13, 2026
- Beta
- 1.02
- Vs S&P 500, 5 years monthly, to Oct 30, 2026
- Average volume
- 2.4M
- 3 months, to Nov 13, 2026
Check the numbers:ExchangeGoogle FinanceYahoo Finance
Balance sheet
- Cash
- $344M
- Debt
- $107M
- Net cash
- $237M
- Credit line
- $2.3B
- undrawn
Cash against debt
debt covered by cash
When the debt is due
The last debt is due in 2026.
Lundin Mining has almost no debt. At September 30, 2026, cash was $344.3 million and debt was $107.3 million of unsecured term loans of subsidiaries, due from October to December 2026, so net cash was $237.0 million. Net cash was about $200 million on November 4, 2026. Nothing was drawn on the $4.5 billion revolving credit facility, which matures in 2031. The company can now use $2.25 billion of it, $3.5 billion after certain conditions and the full amount after the sanction of Vicuña Stage 1. Non-controlling interests, mainly the partners in Candelaria and Caserones, were $1,253.5 million of equity. The company expects borrowings to rise when Vicuña construction starts. Vicuña Corp. also committed $250 million to an infrastructure trust of the Province of San Juan, of which the share of Lundin Mining is $125 million.
As of
Show 1 sourceHide sources
Dividends
- Yield at the current rate
- 0.5% (current annual rate, at today’s price)
- Dividend yield
- 0.5% (last 12 months, at today’s price of CA$22.58)
- Paid per share
- CA$0.112 in the last 12 months (4 payments)
- Current annual rate
- CA$0.112 (CA$0.028 × 4 a year)
- Latest ex-dividend date
- September 4, 2026, CA$0.028 per share
Dividends per share by year
| 2017 | CA$0.12 | |
|---|---|---|
| 2018 | CA$0.12 | |
| 2019 | CA$0.12 | |
| 2020 | CA$0.16 | |
| 2021 | CA$0.39 | |
| 2022 | CA$0.47 | |
| 2023 | CA$0.36 | |
| 2024 | CA$0.45 | |
| 2025 | CA$0.174 |
From 2020 to 2025, the dividend grew by about 1.7% a year. From 2017 to 2025, the dividend grew by about 4.8% a year.
Source: company filings and market data, read on November 13, 2026. The ex-dividend date is the first day a buyer no longer gets the next payment.
Questions about Lundin Mining
What does Lundin Mining do?
Lundin Mining Corporation (Lundin Mining) is a Canadian mining company based in Vancouver. It has three operating mines: Candelaria (80%) and Caserones (75%) in Chile, which produce mainly copper, and Chapada in Brazil, which produces copper and gold. Its market cap is CA$19B at the current price of CA$22.58.
When does Lundin Mining report earnings next?
This is an estimate: Lundin Mining may report on February 4, 2027. It last reported results on November 4, 2026.
Is Lundin Mining stock below its intrinsic value?
Lundin Mining stock is below intrinsic value. The source of the intrinsic value is: AI estimate. This is general information, not advice.
What changed recently at Lundin Mining?
The latest update is from November 4, 2026. Lundin Mining reported Q3 2026 results.
What are the main risks for Lundin Mining?
Copper prices drive most of the value. Vicuña is a large project in the high Andes, on the border of Argentina and Chile. Caserones is at high altitude, and winter storms stopped it for about 30 days in Q3 2026.
How much debt and cash does Lundin Mining have?
At September 30, 2026, Lundin Mining had $107M of debt and $344M of cash.
Does Lundin Mining pay a dividend?
Yes. The current annual dividend of Lundin Mining is CA$0.112 per share. That is a dividend yield of 0.5% at the current price of CA$22.58. The latest ex-dividend date was September 4, 2026.
Similar companies
- NGLOYAnglo AmericanShares: China and geopolitics, Regulation and courts
- Intrinsic value
- Far above intrinsic value
- Gap
- Slow
- BABAAlibaba Group Holding LtdShares: China and geopolitics, Regulation and courts
- Intrinsic value
- Deep below intrinsic value
- Gap
- Will probably not close
- AZNAstraZenecaShares: Regulation and courts, China and geopolitics
- Intrinsic value
- Close to intrinsic value
- Gap
- Can close
- NTESNetEaseShares: China and geopolitics, Regulation and courts
- Intrinsic value
- Far below intrinsic value
- Gap
- Will probably not close
- TCOMTrip.com GroupShares: Regulation and courts, China and geopolitics
- Intrinsic value
- Well below intrinsic value
- Gap
- Slow
Loading your notes…
Read it all? Star LUN or pass, then go on to the next one.